Unpacking Inspection Of Dry-type Transformer Before Installation
Publish Time: Author: Site Editor Visit: 3
Check whether the packaging is intact. Dry Type Transformer After unpacking, check whether the nameplate data of the dry-type transformer meets the design requirements, whether the factory documents are complete, whether the dry-type transformer is intact, whether there are signs of external damage, whether the parts are displaced and damaged, whether the electrical support or connecting wires are damaged, and finally check whether the spare parts are damaged and short.