Dry Type Transformer Installation
First, check the foundation of Dry Type Transformer and whether the embedded steel plate is level. There should be no holes under the steel plate to ensure that the foundation of the transformer has good earthquake resistance and sound absorption performance, otherwise the noise of the installed transformer will increase. Then, use the roller to move the transformer to the installation position, remove the roller, and accurately adjust the transformer to the designed position. The installation level error meets the design requirements. Finally, weld four short channel steels on the embedded steel plate, close to the four corners of the transformer base, so that the transformer will not move during use.